project brief

Villa Group Development Project in Brisbane

Project Type

New house construction

Product Type

HT102 Series

start date

1 月 3, 2024

end date

4 月 10, 2024

Address

Brisbane

innovative process

The challenge

A builder in Brisbane undertook a development project with 30 high-end villas and needed to provide high-end and personalized door and window solutions. Core needs: the doors and windows must meet Australian AS1288/AS2047/AS&NZ52208 standards, and have good thermal insulation and sound insulation performance; the styles must be diversified to adapt to various decoration styles such as Mediterranean and modern minimalist of different villas; at the same time, the cost of bulk supply must be controlled to ensure project profits, and the supply and installation of all doors and windows must be completed within 80 days. In addition, the customer required high-end brand hardware for doors and windows to improve the quality of the villas.

project goals

1. Compliance and Performance Goal: Meet AS1288/AS2047/AS&NZ52208 standards; ensure good thermal insulation and sound insulation performance.

2. Aesthetic and Personalization Goal: Provide diversified styles to adapt to different villa decoration styles; use high-end hardware to enhance villa quality.

3. Efficiency and Cost Goal: Complete bulk supply and installation within 80 days; control costs within the budget.

  • Pulvinar vestib alum purus pulvinar tincidunt
  • Eget congue sollicitudin mattis a lobortis

  • Convallis diam morbi dis at arcu sed morbi dolor

the result

After customizing the combined solution of HT102 Series (Casement Windows, Awning Windows) + HT150 Narrow Sliding Doors for them (matched with glass meeting AS&NZ52208 standards and KINLONG hardware), all project goals were fully achieved:

Compliance and High Performance: All products passed the verification of AS1288/AS2047/AS&NZ52208 standards, with excellent thermal insulation and sound insulation performance, meeting the high-end villa needs.

Diversified Aesthetic Matching: According to different villa decoration styles, we provided frames of different colors (beige, silver gray, matte black) and window types, which perfectly matched the Mediterranean and modern minimalist styles. The high-end KINLONG hardware improved the use experience and villa quality.

Efficient Bulk Delivery and Cost Control: Through modular production and bulk transportation, we completed the supply and installation in 72 days, 8 days ahead of schedule. The bulk procurement reduced the cost by 10% compared with the budget, effectively ensuring the project profit. The builder has designated our products as the preferred solution for their subsequent high-end villa projects.

downloads

manufacturing guide
annual factory report
avada factory profile

Crafting the high quality products you can trust, Serving you better since 1995!